Light-weight Insulating Castables for Heating Furnace,Insulating Castable
Light-weight Insulating Castables for Heating Furnace
This product mainly takes multi-hole clinker, floating ball, vermiculite and perlite as principal raw materials, and it is characterized by high strength, good heat insulation property and thermal shock resistance. It can be used as the heat-insulation castable on parts like furnace wall, top and bottom of various steel rolling heating furnaces.
This product mainly takes multi-hole clinker, floating ball, vermiculite and perlite as principal raw materials, and it is characterized by high strength, good heat insulation property and thermal shock resistance. It can be used as the heat-insulation castable on parts like furnace wall, top and bottom of various steel rolling heating furnaces.
Tuesday, November 19, 2013
Refractory Castables for Working Lining of Heating
Refractory Castables for Working Lining of Heating
The castables, characterized by qualified flint clay, superfine aluminuma, fused alumina, sintered mullite, etc material and combined with micro mist, several additives. Its main character is good volume stability, good thermal shock resistance and high strength, widely used for heating furnace’s roof and wall of various types of steel rolling by casting.
The castables, characterized by qualified flint clay, superfine aluminuma, fused alumina, sintered mullite, etc material and combined with micro mist, several additives. Its main character is good volume stability, good thermal shock resistance and high strength, widely used for heating furnace’s roof and wall of various types of steel rolling by casting.
Thursday, November 14, 2013
Dry Vibration Mix
Dry Vibration Mix
This
product is mainly used for tundish lining, which is the 3rd generation
of high-tech product following insulation board and tundish coating, and
this product is characterized by convenient construction, without
baking and long service life.
Tuesday, November 12, 2013
Construction of Refractory Castable
During the construction of refractory castable, special
attention should be paid on pin welding, asphalt brushing, stirring of castable
with water, making and fixing of mould, vibration and ramming of castable,
demoulding, sizes’ and measuring points’ accuracy, etc. http://www.yilongrefractory.comDo construction strictly as material manufacturer and boiler works required.
1. Installation of Pin and Claw Nails
Reinstall the pins missing for any
reason and the pins in the area of heating surface composite melding junction
before hydraulic pressure. Lengthen
and reinstall the pins properly in coal mouth, material return mouth and upper inflection
point of air duct furnace so that meets the required density of pins. Brush all
the pre-buried metal parts and claw nails with asphalt paint (thickness > 1mm) or cover them with combustibles
before casting.
2. Dosing and Stirring of Castable & Water
The dosing of castable and water
should be done strictly as the instructions of material manufacturer. The water
should be clean, such as drinking water, ph 6-8. The mixer should be clean forced
action mixer, and clean it for the
next time using. Pay attention on the adding order of castable and water and
its stirring time, adding water freely and prolonging of stirring time are forbidden.
The water and castable should be mixed evenly and stirred till smooth. Carry
away the mixed casatble immediately after stirring, the castable poured out
from stirring tank is disallowed to be poured into the tank and stirred again.
Clean the tank after every construction for the next using, record the amount
of water and castable, and the stirring time.
3. Checking Before Making Template
Check carefully whether the pin, hook
nail and strutting part conform to the drawing, whether all the re-welding and
is done and firm, whether the temporary
metal parts have been cut off. Check whether the metal parts which should be
brushed with asphalt paint meet the requirement, whether the casting place is
clean, any other unrelated materials are forbidden to appear. For easy
demoulding, a thin tier of partition (such as used
oil) can be brushed in the mould. There can not be gaps between each two
templates to avoid castable leaking out, so that also convenient for mould
releasing. The refractory castable should be used up in 30 minutes after
stirring, and should be casted to the required thickness in 1 time. Ram the
castable till tight. For the too thick parts, cast tier by tier, while casting
the upper tier, vibration bar can not touch the lower casted tier.
Tuesday, October 22, 2013
Casting of Backing Layer for Ladle Bottom (Construction Time: 1 Day)
Casting
of Backing Layer for Ladle Bottom (Construction Time: 1 Day)
Firstly, fix Permeable Brick and Ladle Nozzle Well Block, and then plug
the inner hole with some resilient staff.
Secoendly, weld some anchoring nails in the middle area of ladle bottom
between one well block and another, the vertical and horizontal distances
between every two anchoring nails are 25mm and 30mm.
Thirdly, mix backing layer castable for ladle with about 5% of water,
and then stir it for about 20 minutes till smooth.
At last, pave the mixed backing layer castable at the bottom of ladle,
and then vibrate it to 100mm
in thickness by flat vibrator.
Casting
of Backing Layer for Ladle wall (Construction Time: 1 Day)
After maintenance of bottom permanent
layer, stick a layer of high alumina fiber mat which is 10mm in thickness with the ladle shell. Then
place the mould right in the middle, flat, no deviation. The mould surface
should be clean, smooth and greased for easy demould.
Lay
the mould properly to ensure that the gaps between mould and sidewall are the
same, then pour the mixed backing layer castable into the gaps, vibrate it by
vibration bar till no bubble emerges(If mould is unavailable, cast working
layer first and then permanent backing layer). The bottom of permanent backing
layer is 100mm in
height; vibrate 300-400mm
per time, and its 90-100mm
in thickness, then one circle by one circle till to the top.
After
vibration of permanent backing layer, lift the ladle to an area at higher
temperature, so that it is convenient for water evaporation and drying of cast
body. The time of demould should be more than 12 hours, usually 24 hours,
specific time depends on lining harden situation.
Wednesday, October 16, 2013
Refractory Castables for Working Lining of Heating Furnaceng in heating furnace working
The
castables, characterized by qualified flint clay, superfine aluminuma,
fused alumina, sintered mullite, etc material and combined with micro
mist, several additives. Its main character is good volume stability,
good thermal shock resistance and high strength, widely used for heating
furnace’s roof and wall of various types of steel rolling by casting.
Thursday, October 10, 2013
Ramming Mass,Furnace Lining Ramming Mass,Ramming Mass Material,Electric Furnace Material
Ramming Mass
The product is characterized by high corrosion and erosion resistance against molten steel and slag, dense sintered layer, long service life, low consumption of per ton steel, easy construction and repairing, and energy saving.
The product is characterized by high corrosion and erosion resistance against molten steel and slag, dense sintered layer, long service life, low consumption of per ton steel, easy construction and repairing, and energy saving.
Subscribe to:
Posts (Atom)