Showing posts with label castable material. Show all posts
Showing posts with label castable material. Show all posts

Thursday, March 6, 2014

Tuesday, December 24, 2013

Light-weight Insulating Castables for Heating Furnace,Insulating Castable

Light-weight Insulating Castables for Heating Furnace

This product mainly takes multi-hole clinker, floating ball, vermiculite and perlite as principal raw materials, and it is characterized by high strength, good heat insulation property and thermal shock resistance. It can be used as the heat-insulation castable on parts like furnace wall, top and bottom of various steel rolling heating furnaces.

Tuesday, November 19, 2013

Refractory Castables for Working Lining of Heating

Refractory Castables for Working Lining of Heating 

The castables, characterized by qualified flint clay, superfine aluminuma, fused alumina, sintered mullite, etc material and combined with micro mist, several additives. Its main character is good volume stability, good thermal shock resistance and high strength, widely used for heating furnace’s roof and wall of various types of steel rolling by casting.

Thursday, November 14, 2013

Dry Vibration Mix

Dry Vibration Mix 

This product is mainly used for tundish lining, which is the 3rd generation of high-tech product following insulation board and tundish coating, and this product is characterized by convenient construction, without baking and long service life.
 

Tuesday, November 12, 2013

Construction of Refractory Castable


During the construction of refractory castable, special attention should be paid on pin welding, asphalt brushing, stirring of castable with water, making and fixing of mould, vibration and ramming of castable, demoulding, sizes’ and measuring points’ accuracy, etc. http://www.yilongrefractory.comDo construction strictly as material manufacturer and boiler works required.
1. Installation of Pin and Claw Nails
Reinstall the pins missing for any reason and the pins in the area of heating surface composite melding junction before hydraulic pressure. Lengthen and reinstall the pins properly in coal mouth, material return mouth and upper inflection point of air duct furnace so that meets the required density of pins. Brush all the pre-buried metal parts and claw nails with asphalt paint (thickness > 1mm) or cover them with combustibles before casting.
2. Dosing and Stirring of Castable & Water
The dosing of castable and water should be done strictly as the instructions of material manufacturer. The water should be clean, such as drinking water, ph 6-8. The mixer should be clean forced action mixer, and clean it for the next time using. Pay attention on the adding order of castable and water and its stirring time, adding water freely and prolonging of stirring time are forbidden. The water and castable should be mixed evenly and stirred till smooth. Carry away the mixed casatble immediately after stirring, the castable poured out from stirring tank is disallowed to be poured into the tank and stirred again. Clean the tank after every construction for the next using, record the amount of water and castable, and the stirring time.
3. Checking Before Making Template
Check carefully whether the pin, hook nail and strutting part conform to the drawing, whether all the re-welding and is done and firm, whether the temporary metal parts have been cut off. Check whether the metal parts which should be brushed with asphalt paint meet the requirement, whether the casting place is clean, any other unrelated materials are forbidden to appear. For easy demoulding, a thin tier of partition (such as used oil) can be brushed in the mould. There can not be gaps between each two templates to avoid castable leaking out, so that also convenient for mould releasing. The refractory castable should be used up in 30 minutes after stirring, and should be casted to the required thickness in 1 time. Ram the castable till tight. For the too thick parts, cast tier by tier, while casting the upper tier, vibration bar can not touch the lower casted tier.

Tuesday, October 22, 2013

Casting of Backing Layer for Ladle Bottom (Construction Time: 1 Day)


Casting of Backing Layer for Ladle Bottom (Construction Time: 1 Day)
    Firstly, fix Permeable Brick and Ladle Nozzle Well Block, and then plug the inner hole with some resilient staff.
    Secoendly, weld some anchoring nails in the middle area of ladle bottom between one well block and another, the vertical and horizontal distances between every two anchoring nails are 25mm and 30mm.
    Thirdly, mix backing layer castable for ladle with about 5% of water, and then stir it for about 20 minutes till smooth.
    At last, pave the mixed backing layer castable at the bottom of ladle, and then vibrate it to 100mm in thickness by flat vibrator.
Casting of Backing Layer for Ladle wall (Construction Time: 1 Day)
    After maintenance of bottom permanent layer, stick a layer of high alumina fiber mat which is 10mm in thickness with the ladle shell. Then place the mould right in the middle, flat, no deviation. The mould surface should be clean, smooth and greased for easy demould.
    Lay the mould properly to ensure that the gaps between mould and sidewall are the same, then pour the mixed backing layer castable into the gaps, vibrate it by vibration bar till no bubble emerges(If mould is unavailable, cast working layer first and then permanent backing layer). The bottom of permanent backing layer is 100mm in height; vibrate 300-400mm per time, and its 90-100mm in thickness, then one circle by one circle till to the top.
    After vibration of permanent backing layer, lift the ladle to an area at higher temperature, so that it is convenient for water evaporation and drying of cast body. The time of demould should be more than 12 hours, usually 24 hours, specific time depends on lining harden situation.

Wednesday, October 16, 2013

Refractory Castables for Working Lining of Heating Furnaceng in heating furnace working

The castables, characterized by qualified flint clay, superfine aluminuma, fused alumina, sintered mullite, etc material and combined with micro mist, several additives. Its main character is good volume stability, good thermal shock resistance and high strength, widely used for heating furnace’s roof and wall of various types of steel rolling by casting.
 

Thursday, October 10, 2013

Ramming Mass,Furnace Lining Ramming Mass,Ramming Mass Material,Electric Furnace Material

 Ramming Mass
The product is characterized by high corrosion and erosion resistance against molten steel and slag, dense sintered layer, long service life, low consumption of per ton steel, easy construction and repairing, and energy saving.